Wipro

The grid drops, the set starts, the load transfers, and it returns when the mains hold.

  • 2021
Wipro

Project details

Industry
IT infrastructure
Application
Standby power
Grid loss to load
<8s
Operator actions
0
Return when mains hold
Auto

Problem

Critical IT loads relied on a standby generator that needed an operator to start and transfer. Every grid failure meant a gap.

Solution Provided by Asian Power Controls

  • Define the sequence: Grid loss, start, transfer and return were written down as one unattended sequence.
  • Automate: AMF control and breaker interlocks were engineered around the site's switchgear.
  • Prove it: Mains failures were simulated on site until every step ran without intervention.

Benefits Achieved

The grid drops, the set starts, the load transfers, and it returns when the mains hold - with no operator action.