Speed, load and overspeed protection were proved on the machine before it returned to service.

  • Jindal Steel & Power
  • 2019
Jindal Steel & Power

Project details

Industry
Steel
Application
Turbine control
Woodward governor fitted
505
Turbine back in service
1
Overspeed test proved
Full

Problem

A steam turbine was running on an obsolete governor with limited protection, and the plant needed it back in service with confidence.

Solution Provided by Asian Power Controls

  • Survey: The turbine, valves and existing trip circuits were surveyed on site.
  • Retrofit: A Woodward 505 governor was engineered into the control scheme.
  • Prove: Speed, load and overspeed protection were tested on the machine.

Benefits Achieved

Speed, load and overspeed protection were proved on the machine before it returned to service.

Their team understood our turbine control requirements quickly and delivered a custom-built panel that improved both safety and performance.
Divya Kulkarni - Plant Engineer, Jindal Steel & Power

Products Used in This Project