Skip to content
← All case studies

Tata Power

The intertie stays inside its limit while the machines share real and reactive load.

  • 2022
Tata Power

Project details

Industry
Power generation
Application
Captive power
Import limit on the tie
Held
Real and reactive load
Shared
Master for the fleet
1

Problem

Captive generators running in parallel with the grid were not sharing load evenly, and the import limit on the intertie was hard to hold.

Solution Provided by Asian Power Controls

  • Model the plant: Machines, intertie and load profile were modelled together.
  • One master: A master controller was set up to coordinate import/export and load sharing.
  • Tune on site: Real and reactive sharing were tuned on the running plant.

Benefits Achieved

The intertie stays inside its limit while the machines share real and reactive load.

Asian Power's power quality solutions stabilised our facility's energy flow and cut downtime. The technology is solid, and their support team is always a call away.
Sanjay Deshmukh - Technical Director, Tata Power

Products Used in This Project