A fault that isn't cleared becomes a damaged machine.

Generator, transformer and feeder faults develop faster than an operator can react. The relay is what sees the fault and opens the breaker. We engineer SEG protection so that trip is selective, fast, and proven before the plant depends on it.

How we deliver.

  1. Study the plant

    We start from the single-line, the machine data and the faults the scheme has to clear - not from a relay catalogue.

  2. Select the scheme

    SEG protection is chosen and graded with the rest of the system so a feeder fault does not take the whole plant with it.

  3. Set and test

    Settings, logic and breaker trips are proven on the bench and again on site, with the results written down.

  4. Stand by

    After commissioning we stay reachable for settings changes, investigations and the next extension of the scheme.