Harmonics, power factor and the interchange with the grid were brought back inside limits.

  • UltraTech Cement
  • 2018
UltraTech Cement

Project details

Industry
Cement
Application
Power quality
Power factor held
0.99
Harmonics brought down
~30%
Bus kept in limits
24×7

Problem

Large variable-speed drives pushed harmonics onto the plant bus, power factor drifted and the interchange with the grid kept moving outside limits.

Solution Provided by Asian Power Controls

  • Measure: A power quality audit recorded harmonics, power factor and load behaviour across the shifts.
  • Size: Filtering and compensation were sized from the measured data, not from nameplates.
  • Install: Active filtering and VAR compensation were integrated with the existing switchgear.
  • Verify: Post-installation measurements confirmed the bus was back inside limits.

Benefits Achieved

Harmonics, power factor and the grid interchange were brought back inside limits and held there around the clock.

A trusted partner in our energy management initiatives - an efficient, reliable power control solution backed by excellent post-installation support.
Pradeep Nair - Facility Manager, UltraTech Cement