Skip to content
← All case studies

Mapro

Generators, bus and mains close as one scheme, so a single trip does not take the line down.

  • Maharashtra
  • 2016
Mapro

Project details

Industry
Food processing
Application
Process sync
Gensets synchronized
4
To close the breaker
<2s
Scheme for the plant
1

Problem

The plant ran four diesel generators that were started and paralleled by hand. Every switchover depended on the operator on shift, and one bad closure could trip the whole process line.

Solution Provided by Asian Power Controls

  • Study the load: We mapped the process loads, the mains behaviour and every switching sequence the plant needed.
  • One scheme: Synchronisation, load sharing and breaker control were engineered together on Woodward controllers.
  • Build and test: The panels were built and tested in our Wadki facility against the agreed scheme.
  • Commission: Every failure scenario was proved on site before handover.

Benefits Achieved

Generators, bus and mains now close as one scheme. A single trip no longer takes the line down, and switchovers no longer depend on who is on shift.

Products Used in This Project